Diego Garcia Projects

Diego Garcia ProjectsJanae Peterson2024-05-07T09:42:11-07:00
  • All
  • Airfield (Diego Garcia)
  • Design-Build (Diego Garcia)
  • Industrial (Diego Garcia)
  • Marine (Diego Garcia)
  • Vertical (Diego Garcia)
Janae Peterson2024-05-07T09:14:59-07:00

Repair Control Tower, Building 913

Diego Garcia, Industrial (Diego Garcia)

This project provides improvement and repairs of the existing air control tower. The work includes but is not limited to, the comprehensive design and repair for passenger elevator, electrical system, roofing, finishes of exterior ...

Janae Peterson2024-05-07T09:23:13-07:00

Repair Shoreline Revetment

Design-Build (Diego Garcia), Diego Garcia

The work for this project will repair existing revetment and restore portions of the shoreline to protect threatened infrastructure along the approximately 390 feet of shoreline fronting BOQ-7. Repair includes replacing the existing rubble-mound ...

Janae Peterson2024-05-07T09:27:10-07:00

Consolidated Construction Projects – Runway Pavement Repairs (Project S)

Airfield (Diego Garcia), Diego Garcia

This contract required various repairs to the existing 12,000 foot long by 200 foot wide concrete runway. Spalls and other damaged section of the runway were cut out with concrete saws, chipped with power hammers, ...

Janae Peterson2024-05-07T09:42:44-07:00

Consolidated Construction Projects (North Ramp)

Airfield (Diego Garcia), Diego Garcia

This contract required the removal of the existing concrete ramps; scarifying existing sub grade to a depth of 3 feet followed by regarding and compacting; placement of a new 22-inches thick 254,000 square feet non-reinforced PCC ...

Janae Peterson2024-05-07T09:48:16-07:00

Consolidated Construction Projects (B2 Parking Apron)

Airfield (Diego Garcia), Diego Garcia

Construct four new concrete pavements to support prefabricated B-2 Bomber Shelter Systems (B-2SS). Each apron is approximately 40 m by 76 m with a pavement structure consisting of 520 mm of non-reinforced PCC and 300 ...

Janae Peterson2024-05-07T09:53:31-07:00

Potable Water Plant Modernization

Design-Build (Diego Garcia), Diego Garcia

Work under this Design Build project provides for the construction of a new water treatment facility capable of producing 1,200,000 gallons of drinking in the Cantonment area by replacing the existing ...

Janae Peterson2024-05-07T09:56:24-07:00

Bachelor Enlisted Quarters, U.S. Navy Support Facility

Design-Build (Diego Garcia), Diego Garcia

This design-build project provides a one-thousand square meter, two story, 14 unit, 28 bedroom bachelor enlisted quarters, including lounges and mechanical and electrical utility rooms. Each unit consists of two bedrooms, a kitchenette, bathroom, acrylic ...

Janae Peterson2024-05-07T09:59:45-07:00

Solid Waste Management Center & Dental Clinic Replacement

Diego Garcia, Industrial (Diego Garcia)

Project A - Dental Clinic Replacement Project Description The work includes minor selective site demolition, concrete foundation and slabs, reinforced concrete masonry and structural steel structure, modified bitumen roofing over rigid insulation and ...

Janae Peterson2024-05-07T10:03:30-07:00

Aircraft Intermediate Maintenance Facility

Diego Garcia, Industrial (Diego Garcia)

The scope of work involved construction of a new Aircraft Intermediate Maintenance Facility consisting of a 25,000sf two-story cast in place reinforced concrete building having reinforced concrete foundations and floor slabs, and cast in ...

Janae Peterson2024-05-07T10:07:41-07:00

Wharf Improvements & SSGN Support Facility

Diego Garcia, Marine (Diego Garcia)

This project included demolition of a 41,000SF x 14" concrete wharf deck midsection with 9300SF - 3' thick reinforced concrete utility trenches and 3’ thick crane platform. New work included on-site casting, load ...

Janae Peterson2022-03-29T11:44:53-07:00

U.S. Navy Support Facility

Diego Garcia, Vertical (Diego Garcia)

Building NGIS 18 is a 2-story, 32-room reinforced concrete frame with CMU infill structure built in 1982. No major improvements had been undertaken on this facility since it was constructed. The building components ...

Janae Peterson2025-04-30T07:43:12-07:00
Completed switchgear building

Consolidated Communications Facility

Design-Build (Diego Garcia), Diego Garcia

Work under this Design Build project provides for the construction of a new water treatment facility capable of producing 1,200,000 gallons of drinking water in the Cantonment area by replacing the existing ...

San Juan Construction, Inc. is an Affirmative Action (AA) and Equal Opportunity Employer (EOE)
San Juan Construction ©   |   All Rights Reserved   |   Website Powered by BPetersonDesign
Page load link
Go to Top