FY07 Consolidated Construction Projects for U.S. Naval Support Facilities, Diego Garcia, B.I.O.T.

Scope of Work:  (Part A) The design-bid-build work is generally located at Wharf B and includes demolition; fender pile improvements; deck improvements supported by piles; mooring fittings; curb repairs below mooring fittings; concrete pavement; reinforced concrete and pre-engineered steel buildings; oil-water separator and tanks; low-pressure compressed air plant, and de-mineralized water plant; electrical substation and power mounds; sewer, oily-waste, high-pressure nitrogen, and fire protection water lines; utility trenches and outlets along the face of Wharf B; sewage force main and incidental related work.
image
image

Contract Number:
N62742-07-C-1313 (DGM21,LLC Joint Venture)

Issued By:
PACNAVFACENGCOM DET